The works archives connect 55 of the 65 CIPI-linked contracts to 57 lots in 53 agreements. A lot is a package of work under a contract. The selected lot records connect to 73 planned subgoals by instrument and lot IDs. Official works contract guide.
Find contract lots
57 lots
| Lot ID and number | Agreement and project | CIPI-linked contract | Works instrument and contract IDs | Lot archive row |
|---|---|---|---|---|
| 7890Lot 1 | 877955 22765.35-30IRMANDADE DA SANTA CASA DE MISERICORDIA DE SOROCABA | 002/2022Signed 2022-03-17 | 6359 / 7732 | 15,390 |
| 3465Lot 1 | 878366 18886.23-70SANTA CASA DE MISERICORDIA DE SOBRAL | 59326/2018Signed 2018-12-06 | 2887 / 22786 | 20,915 |
| 4523Lot 2 | 878367 18887.23-26SANTA CASA DE MISERICORDIA DE SOBRAL | 59293/2018Signed 2018-11-14 | 3777 / 22990 | 29,155 |
| 12243Lot 1 | 878547 51800.25-09FUNDACAO NAPOLEAO LAUREANO | 001/2022Signed 2022-01-10 | 7819 / 12155 | 23,182 |
| 16765Lot 1 | 879093 95664.32-80FUNDACAO HOSPITAL MATERNIDADE SAO CAMILO | 001/2023Signed 2023-05-30 | 13568 / 16653 | 7,757 |
| 3043Lot 1 | 886237 12046.35-65FUNDACAO DOUTOR AMARAL CARVALHO | 073/2021Signed 2021-10-25 | 2536 / 2837 | 11,452 |
| 24607Lot 1 | 889850 94144.32-05FUNDACAO HOSPITAL MATERNIDADE SAO CAMILO | 138/2023Signed 2024-12-05 | 20084 / 24519 | 22,792 |
| 18254Lot 1 | 889894 11501.33-47ASSOCIACAO PESTALOZZI DE NITEROI | 001/2023Signed 2023-01-19 | 9545 / 18147 | 10,100 |
| 7249Lot 1 | 891046 22766.35-97IRMANDADE DA SANTA CASA DE MISERICORDIA DE SOROCABA | 002/2022Signed 2022-03-17 | 5863 / 7351 | 15,177 |
| 2111Lot 2 | 895978 24628.35-30INSTITUTO DAS PEQUENAS MISSIONARIAS DE MARIA IMACULADA | 001/2021Signed 2021-09-27 | 1087 / 2131 | 4,133 |
| 14196Lot 1 | 895978 24628.35-30INSTITUTO DAS PEQUENAS MISSIONARIAS DE MARIA IMACULADA | 001/2023Signed 2023-04-10 | 1087 / 14137 | 4,223 |
| 19713Lot 1 | 899507 96931.25-90INSTITUTO WALFREDO GUEDES PEREIRA | 01/2022Signed 2023-01-24 | 15985 / 20282 | 26,124 |
| 14978Lot 1 | 900892 20217.35-08IRMANDADE DA SANTA CASA DE MIS DE TUPI PAULISTA | 01/2023Signed 2023-02-22 | 12090 / 14860 | 4,446 |
| 6256Lot 1 | 904643 25151.27-90ASSOCIACAO PESTALOZZI DE MACEIO | 011/2022Signed 2022-02-23 | 4154 / 6065 | 14,139 |
| 14799Lot 1 | 905339 20302.35-37FUNDACAO HEMOCENTRO DE RIBEIRAO PRETO | 23/2023Signed 2023-03-29 | 11936 / 14672 | 19,465 |
| 14124Lot 1 | 907963 22097.31-80SANTA CASA DE MISERICORDIA DE SAO SEBASTIAO DO PARAISO | 01/2023 - TR 907963Signed 2023-04-03 | 11368 / 14006 | 13,133 |
| 19338Lot 1 | 907973 38903.41-72PEQUENO COTOLENGO DO PARANA DOM ORIONE | 001/2023Signed 2024-06-17 | 15660 / 21258 | 2,265 |
| 18632Lot 1 | 917589 24678.35-57IRMANDADE DA SANTA CASA DE MISERICORDIA DE SOROCABA | 03/2023Signed 2023-11-01 | 15079 / 18517 | 5,162 |
| 25864Lot 1 | 917591 51878.26-15HOSPITAL INFANTIL PALMIRA SALES | 001/2025/HIPSSigned 2025-04-22 | 21089 / 25782 | 14,172 |
| 34143Lot 1 | 917658 44202.35-75IRMANDADE DA SANTA CASA DE MISERICORDIA DE SOROCABA | 02/2025Signed 2025-08-25 | 19088 / 34135 | 37,555 |
| 18702Lot 1 | 919037 36550.35-71SANTA CASA DE MISERICORDIA DE FARTURA | 001/2023Signed 2023-12-15 | 15132 / 18958 | 18,491 |
| 28623Lot 1 | 919170 35404.41-10PEQUENO COTOLENGO DO PARANA DOM ORIONE | 919170Signed 2025-09-16 | 16729 / 28478 | 25,785 |
| 23097Lot 1 | 920442 13705.35-46SANTA CASA DE MISERICORDIA DE ITUVERAVA | 01/2024Signed 2024-03-20 | 18805 / 23081 | 18,409 |
| 18752Lot 1 | 921640 14878.52-90APAE ASSOCIACAO DE PAIS E AMIGOS DOS EXCEPCIONAIS DE ANAPOLIS | 001/2023Signed 2023-12-28 | 15173 / 18675 | 16,355 |
| 23971Lot 1 | 922695 134425.28-18HOSPITAL SAO LUIZ GONZAGA | 01/2024Signed 2025-08-26 | 19541 / 23907 | 37,498 |
| 19247Lot 1 | 923544 30372.35-78SANTA CASA DE POMPEIA | 001/2024Signed 2024-03-11 | 15587 / 19274 | 18,284 |
| 26472Lot 1 | 929373 57669.25-18FUNDO MUNICIPAL DE SAUDE DE PITIMBU | 004/2025Signed 2025-04-03 | 21585 / 26315 | 27,116 |
| 27396Lot 1 | 929405 51384.29-00ASSOCIACAO OBRAS SOCIAIS IRMA DULCE | 02/2025Signed 2025-03-10 | 22366 / 27288 | 25,553 |
| 29848Lot 0 | 929836 15482.35-39ASSOCIACAO DE AMPARO AO EXCEPCIONAL RITINHA PRATES | 001/2025Signed 2025-07-07 | 22425 / 29655 | 28,755 |
| 27037Lot 1 | 934315 11541.35-75IRMANDADE DA SANTA CASA DE MISERICORDIA DE SOROCABA | 01/2025Signed 2025-04-04 | 22065 / 26902 | 25,221 |
| 27234Lot 1 | 936178 12007.35-62IRMANDADE DA SANTA CASA DE MISERICORDIA DE SOROCABA | 01/2025Signed 2025-04-04 | 22221 / 27249 | 19,731 |
| 17363Lot 1 | 936402 15451.25-45FUNDACAO PEDRO AMERICO | 119/2023Signed 2023-11-08 | 14042 / 17223 | 23,568 |
| 27457Lot 1 | 936909 19180.28-06HOSPITAL E MATERNIDADE SAO JOSE | 027/2025Signed 2025-07-14 | 22421 / 27707 | 26,343 |
| 25256Lot 1 | 944194 27574.35-00SANTA CASA DE MISERICORDIA N S DAS DORES DE GAL SALGADO | 002/2025Signed 2025-01-22 | 20624 / 25146 | 23,227 |
| 25184Lot 1 | 944198 30763.35-50IRMANDADE DA SANTA CASA DE MISERICORDIA DE SAO PAULO | 1180432/2024Signed 2025-03-07 | 20559 / 27302 | 25,554 |
| 19373Lot 1 | 944202 25683.25-86FUNDACAO PEDRO AMERICO | 01/2024Signed 2024-03-13 | 15694 / 19273 | 31,754 |
| 28599Lot 1 | 945677 29089.41-44PEQUENO COTOLENGO DO PARANA DOM ORIONE | 004/2024Signed 2024-06-28 | 18574 / 28453 | 25,648 |
| 25194Lot 1 | 946285 28643.35-10IRMANDADE DA SANTA CASA DE MISERICORDIA DE PEDERNEIRAS | 001/2025Signed 2025-03-05 | 20567 / 25165 | 23,548 |
| 30367Lot 1 | 948419 32155.35-24FUNDACAO BUTANTAN | CW6708Signed 2025-10-01 | 23919 / 30174 | 27,695 |
| 25077Lot 1 | 948420 32162.35-22FUNDACAO BUTANTAN | CW5115/2024Signed 2025-02-03 | 20474 / 25085 | 22,702 |
| 24712Lot 0 | 948515 33243.31-63FUNDACAO HOSPITALAR SAO VICENTE DE PAULO | 112024Signed 2024-12-02 | 20182 / 24620 | 23,291 |
| 22908Lot 1 | 951784 39241.35-93FUNDACAO DE APOIO INST AO DESENV CIENT E TECNOLOGICO | 013/2024Signed 2024-06-25 | 18654 / 22910 | 23,945 |
| 30028Lot 1 | 951855 31532.35-44FUNDACAO HEMOCENTRO DE RIBEIRAO PRETO | 90/2025Signed 2025-09-05 | 24600 / 29846 | 29,090 |
| 27845Lot 2 | 953157 32208.42-87FUNDACAO UNIVERSIDADE DO OESTE DE SANTA CATARINA | 178/UNOESC/2025Signed 2025-08-08 | 20010 / 27684 | 26,301 |
| 24522Lot 1 | 953157 32208.42-87FUNDACAO UNIVERSIDADE DO OESTE DE SANTA CATARINA | 999994606/12/24/PJSigned 2024-12-20 | 20010 / 25327 | 28,574 |
| 25427Lot 2 | 953189 31402.41-81PEQUENO COTOLENGO DO PARANA DOM ORIONE | 006/2025Signed 2025-02-18 | 20742 / 25303 | 1,959 |
| 25428Lot 1 | 953189 31402.41-81PEQUENO COTOLENGO DO PARANA DOM ORIONE | 006/2025Signed 2025-02-18 | 20742 / 25303 | 1,960 |
| 30309Lot 2 | 953325 31534.35-57FUNDACAO HEMOCENTRO DE RIBEIRAO PRETO | 91/2025Signed 2025-09-05 | 24842 / 30117 | 27,270 |
| 30310Lot 1 | 953325 31534.35-57FUNDACAO HEMOCENTRO DE RIBEIRAO PRETO | 91/2025Signed 2025-09-05 | 24842 / 30117 | 27,271 |
| 24708Lot 1 | 959442 38503.41-80HOSPITAL DE CARIDADE SAO VICENTE DE PAULO | 001/2025Signed 2025-01-08 | 20178 / 24615 | 23,239 |
| 29688Lot 1 | 960397 51166.33-70FUNDACAO EDUCACIONAL D ANDRE ARCOVERDE | 001/2025Signed 2025-10-22 | 24311 / 29831 | 37,685 |
| 27192Lot 2 | 966852 42304.33-19FUNDACAO COORDENACAO DE PROJETOS,PESQUISAS E ESTUDOS TECNOLOGICOS COPPETEC | 398/2025Signed 2025-07-17 | 22186 / 27350 | 26,621 |
| 40665Lot 1 | 968706 50388.41-40PEQUENO COTOLENGO DO PARANA DOM ORIONE | 012026Signed 2026-11-06 | 20929 / 40517 | 38,021 |
| 33445Lot 2 | 969926 50477.42-30FUNDACAO UNIVERSIDADE DO OESTE DE SANTA CATARINA | 005/2025Signed 2025-11-05 | 26473 / 33269 | 31,880 |
| 29739Lot 1 | 971731 51196.31-92ASS DE PAIS E AMIGOS DOS EXCEPCIONAIS DE PARA DE MINAS | 001/2025Signed 2025-09-29 | 24355 / 29551 | 38,104 |
| 28936Lot 1 | 972546 51200.42-47SOCIEDADE LITERARIA E CARITATIVA SANTO AGOSTINHO | 006/2025Signed 2025-09-03 | 23666 / 28788 | 5,724 |
| 29628Lot 2 | 973513 51879.33-03FUNDACAO COORDENACAO DE PROJETOS,PESQUISAS E ESTUDOS TECNOLOGICOS COPPETEC | 691/2025Signed 2025-11-10 | 24258 / 29926 | 29,354 |
No lots match these filters.
Read planned subgoals and tendered amounts
The subgoal records give planned start dates and tendered amounts in BRL. The budget reference date and locality code come from the reported budget fields. A project municipality is available on the linked project page. A lot or subgoal needs its own location record to place it at a specific work site. Official field definitions.
73 subgoals
| Subgoal and budget IDs | Agreement, instrument and lot | Planned start | Reported budget reference | Tendered amount | Source status and archive row |
|---|---|---|---|---|---|
| 13295Goal 8621 · Budget 13295 | 8779556359 / 7890 | 2022-05-01 | 2020-03-01 · SP | BRL 1,043,372.62 | AAI · Row 11,249 |
| 6134Goal 3946 · Budget 6134 | 8783662887 / 3465 | 2021-08-01 | 2019-08-01 · CE | BRL 231,548.09 | ACT · Row 4,935 |
| 7764Goal 5105 · Budget 7764 | 8783673777 / 4523 | 2021-08-01 | 2019-08-01 · CE | BRL 323,896.71 | ACT · Row 6,338 |
| 20056Goal 13109 · Budget 20056 | 8785477819 / 12243 | 2022-05-01 | 2021-02-01 · PB | BRL 44,095.52 | AAI · Row 17,873 |
| 20057Goal 13109 · Budget 20057 | 8785477819 / 12243 | 2022-05-01 | 2021-02-01 · PB | BRL 18,891.70 | AAI · Row 17,874 |
| 20058Goal 13109 · Budget 20058 | 8785477819 / 12243 | 2022-05-01 | 2021-02-01 · PB | BRL 19,474.49 | AAI · Row 17,872 |
| 20059Goal 13109 · Budget 20059 | 8785477819 / 12243 | 2022-05-01 | 2021-02-01 · PB | BRL 2,833.01 | AAI · Row 10,212 |
| 20060Goal 13109 · Budget 20060 | 8785477819 / 12243 | 2022-05-01 | 2021-02-01 · PB | BRL 35,540.39 | AAI · Row 17,788 |
| 20061Goal 13109 · Budget 20061 | 8785477819 / 12243 | 2022-05-01 | 2021-02-01 · PB | BRL 1,013.54 | AAI · Row 18,670 |
| 20062Goal 13109 · Budget 20062 | 8785477819 / 12243 | 2022-05-01 | 2021-02-01 · PB | BRL 7,039.66 | AAI · Row 18,663 |
| 20063Goal 13109 · Budget 20063 | 8785477819 / 12243 | 2022-05-01 | 2021-02-01 · PB | BRL 34,078.13 | AAI · Row 18,669 |
| 20064Goal 13109 · Budget 20064 | 8785477819 / 12243 | 2022-05-01 | 2021-02-01 · PB | BRL 75,351.92 | AAI · Row 17,789 |
| 20065Goal 13109 · Budget 20065 | 8785477819 / 12243 | 2022-05-01 | 2021-02-01 · PB | BRL 10,275.50 | AAI · Row 17,787 |
| 20066Goal 13109 · Budget 20066 | 8785477819 / 12243 | 2022-05-01 | 2021-02-01 · PB | BRL 71,165.58 | AAI · Row 18,665 |
| 20067Goal 13109 · Budget 20067 | 8785477819 / 12243 | 2022-05-01 | 2021-02-01 · PB | BRL 72,073.95 | AAI · Row 18,668 |
| 20068Goal 13109 · Budget 20068 | 8785477819 / 12243 | 2022-05-01 | 2021-02-01 · PB | BRL 8,885.31 | AAI · Row 18,664 |
| 20069Goal 13109 · Budget 20069 | 8785477819 / 12243 | 2022-05-01 | 2021-02-01 · PB | BRL 2,949.12 | AAI · Row 17,786 |
| 20070Goal 13109 · Budget 20070 | 8785477819 / 12243 | 2022-05-01 | 2021-02-01 · PB | BRL 14,668.61 | AAI · Row 18,666 |
| 20071Goal 13109 · Budget 20071 | 8785477819 / 12243 | 2022-05-01 | 2021-02-01 · PB | BRL 182,874.88 | AAI · Row 18,662 |
| 20072Goal 13109 · Budget 20072 | 8785477819 / 12243 | 2022-05-01 | 2021-02-01 · PB | BRL 114,996.69 | AAI · Row 18,667 |
| 25742Goal 17750 · Budget 25742 | 87909313568 / 16765 | 2023-06-01 | 2022-03-01 · ES | BRL 2,521,423.56 | AAI · Row 8,295 |
| 5457Goal 3468 · Budget 5457 | 8862372536 / 3043 | 2021-12-01 | 2021-03-01 · SP | BRL 1,999,113.63 | AAI · Row 1,786 |
| 35553Goal 25694 · Budget 35553 | 88985020084 / 24607 | 2025-02-01 | 2021-02-01 · ES | BRL 2,035,260.40 | AAI · Row 32,001 |
| 27738Goal 19242 · Budget 27738 | 8898949545 / 18254 | 2022-08-01 | 2022-04-01 · RJ | BRL 537,784.85 | AAI · Row 14,389 |
| 12343Goal 7950 · Budget 12343 | 8910465863 / 7249 | 2022-05-01 | 2021-08-01 · SP | BRL 2,470,009.55 | AAI · Row 7,147 |
| 22718Goal 15143 · Budget 22718 | 8959781087 / 14196 | 2023-05-01 | 2020-12-01 · SP | BRL 389,282.53 | AAI · Row 16,596 |
| 3824Goal 2420 · Budget 3824 | 8959781087 / 2111 | 2021-11-01 | 2020-12-01 · SP | BRL 341,200.00 | AAI · Row 23,639 |
| 29665Goal 20754 · Budget 29665 | 89950715985 / 19713 | 2024-06-01 | 2022-08-01 · PB | BRL 392,883.15 | AAI · Row 25,321 |
| 23643Goal 15936 · Budget 23643 | 90089212090 / 14978 | 2023-01-01 | 2022-08-01 · SP | BRL 539,943.47 | AAI · Row 14,191 |
| 10519Goal 6900 · Budget 10519 | 9046434154 / 6256 | 2022-02-01 | 2021-10-01 · AL | BRL 6,499,216.39 | AAI · Row 9,171 |
| 23431Goal 15749 · Budget 23431 | 90533911936 / 14799 | 2023-06-01 | 2022-08-01 · SP | BRL 505,488.69 | AAI · Row 20,076 |
| 22646Goal 15072 · Budget 22646 | 90796311368 / 14124 | 2023-05-01 | 2022-06-01 · MG | BRL 1,495,000.00 | AAI · Row 17,590 |
| 29127Goal 20366 · Budget 29127 | 90797315660 / 19338 | 2023-11-01 | 2022-08-01 · PR | BRL 337,546.51 | AAI · Row 27,188 |
| 28262Goal 19629 · Budget 28262 | 91758915079 / 18632 | 2023-12-01 | 2023-07-01 · SP | BRL 604,000.00 | AAI · Row 24,211 |
| 37293Goal 26960 · Budget 37293 | 91759121089 / 25864 | 2025-05-01 | 2023-09-01 · PE | BRL 954,616.03 | AAI · Row 32,068 |
| 47731Goal 35310 · Budget 47731 | 91765819088 / 34143 | 2026-04-01 | 2023-07-01 · SP | BRL 1,014,773.34 | AAI · Row 39,836 |
| 28373Goal 19714 · Budget 28373 | 91903715132 / 18702 | 2024-01-01 | 2023-06-01 · SP | BRL 310,559.34 | AAI · Row 24,371 |
| 40677Goal 29734 · Budget 40677 | 91917016729 / 28623 | 2025-10-01 | 2023-05-01 · PR | BRL 506,550.62 | AAI · Row 35,458 |
| 33635Goal 24144 · Budget 33635 | 92044218805 / 23097 | 2024-03-01 | 2023-08-01 · SP | BRL 362,700.40 | AAI · Row 28,537 |
| 28427Goal 19761 · Budget 28427 | 92164015173 / 18752 | 2022-12-01 | 2022-04-01 · GO | BRL 3,270,000.30 | AAI · Row 24,449 |
| 34770Goal 25034 · Budget 34770 | 92269519541 / 23971 | 2024-11-01 | 2023-06-01 · SE | BRL 1,079,500.00 | AAI · Row 30,443 |
| 29022Goal 20271 · Budget 29022 | 92354415587 / 19247 | 2024-02-01 | 2023-08-01 · SP | BRL 349,414.75 | AAI · Row 23,886 |
| 37963Goal 27553 · Budget 37963 | 92937321585 / 26472 | 2025-06-01 | 2023-11-01 · PB | BRL 401,208.88 | AAI · Row 35,252 |
| 39106Goal 28474 · Budget 39106 | 92940522366 / 27396 | 2025-03-01 | 2024-07-01 · BA | BRL 1,265,046.55 | AAI · Row 34,152 |
| 42276Goal 30958 · Budget 42276 | 92983622425 / 29848 | 2025-08-01 | 2024-06-01 · SP | BRL 2,958,680.76 | AAI · Row 13,131 |
| 38652Goal 28109 · Budget 38652 | 93431522065 / 27037 | 2025-08-01 | 2024-06-01 · SP | BRL 317,317.63 | AAI · Row 33,616 |
| 38922Goal 28307 · Budget 38922 | 93617822221 / 27234 | 2025-08-01 | 2024-06-01 · SP | BRL 1,681,580.90 | AAI · Row 33,922 |
| 26540Goal 18341 · Budget 26540 | 93640214042 / 17363 | 2023-08-01 | 2023-05-01 · PB | BRL 1,349,071.80 | AAI · Row 12,294 |
| 39214Goal 28545 · Budget 39214 | 93690922421 / 27457 | 2025-04-01 | 2024-09-01 · SE | BRL 250,294.27 | AAI · Row 34,270 |
| 36474Goal 26356 · Budget 36474 | 94419420624 / 25256 | 2025-03-01 | 2024-05-01 · SP | BRL 292,548.96 | AAI · Row 31,666 |
| 36401Goal 26284 · Budget 36401 | 94419820559 / 25184 | 2025-01-01 | 2023-11-01 · SP | BRL 285,000.21 | AAI · Row 31,545 |
| 29170Goal 20401 · Budget 29170 | 94420215694 / 19373 | 2024-02-01 | 2023-11-01 · PB | BRL 3,162,617.03 | AAI · Row 23,301 |
| 40653Goal 29710 · Budget 40653 | 94567718574 / 28599 | 2024-03-01 | 2023-10-01 · PR | BRL 500,544.56 | AAI · Row 35,422 |
| 36411Goal 26294 · Budget 36411 | 94628520567 / 25194 | 2025-02-01 | 2024-02-01 · SP | BRL 290,900.87 | AAI · Row 31,555 |
| 42832Goal 31470 · Budget 42832 | 94841923919 / 30367 | 2025-10-01 | 2024-12-01 · SP | BRL 59,478,227.53 | AAI · Row 37,637 |
| 36243Goal 26170 · Budget 36243 | 94842020474 / 25077 | 2025-02-01 | 2024-05-01 · SP | BRL 181,123,406.32 | AAI · Row 31,257 |
| 35671Goal 25799 · Budget 35671 | 94851520182 / 24712 | 2025-02-01 | 2023-12-01 · MG | BRL 963,210.04 | AAI · Row 28,184 |
| 33424Goal 23960 · Budget 33424 | 95178418654 / 22908 | 2024-07-01 | 2023-12-01 · SP | BRL 1,730,000.00 | AAI · Row 28,439 |
| 42476Goal 31142 · Budget 42476 | 95185524600 / 30028 | 2025-10-01 | 2024-12-01 · SP | BRL 331,442.69 | AAI · Row 36,807 |
| 35431Goal 25596 · Budget 35431 | 95315720010 / 24522 | 2025-06-01 | 2024-05-01 · SC | BRL 787,132.82 | AAI · Row 29,170 |
| 39693Goal 25596 · Budget 39693 | 95315720010 / 27845 | 2025-08-01 | 2024-05-01 · SC | BRL 307,904.33 | AAI · Row 36,550 |
| 36677Goal 26510 · Budget 36677 | 95318920742 / 25427 | 2025-05-01 | 2024-10-01 · PR | BRL 207,988.86 | AAI · Row 31,989 |
| 36678Goal 26510 · Budget 36678 | 95318920742 / 25428 | 2025-05-01 | 2024-10-01 · PR | BRL 135,001.24 | AAI · Row 31,998 |
| 42772Goal 31413 · Budget 42772 | 95332524842 / 30309 | 2025-10-01 | 2024-12-01 · SP | BRL 283,681.03 | AAI · Row 37,615 |
| 42773Goal 31414 · Budget 42773 | 95332524842 / 30310 | 2025-10-01 | 2024-12-01 · SP | BRL 101,778.87 | AAI · Row 38,470 |
| 35667Goal 25795 · Budget 35667 | 95944220178 / 24708 | 2025-01-01 | 2024-10-01 · PR | BRL 955,987.31 | AAI · Row 27,989 |
| 42032Goal 30799 · Budget 42032 | 96039724311 / 29688 | 2025-10-01 | 2025-02-01 · RJ | BRL 1,285,552.70 | AAI · Row 35,115 |
| 38874Goal 28264 · Budget 38874 | 96685222186 / 27192 | 2025-08-01 | 2024-12-01 · RJ | BRL 207,922.84 | AAI · Row 33,890 |
| 55450Goal 41887 · Budget 55450 | 96870620929 / 40665 | 2026-11-01 | 2024-11-01 · PR | BRL 481,626.51 | AAI · Row 47,435 |
| 46806Goal 34597 · Budget 46806 | 96992626473 / 33445 | 2025-08-01 | 2025-04-01 · SC | BRL 409,145.53 | AAI · Row 30,803 |
| 42125Goal 30847 · Budget 42125 | 97173124355 / 29739 | 2025-10-01 | 2025-06-01 · MG | BRL 1,107,348.44 | AAI · Row 39,074 |
| 41084Goal 30044 · Budget 41084 | 97254623666 / 28936 | 2025-11-01 | 2025-04-01 · SC | BRL 1,294,999.98 | AAI · Row 36,094 |
| 41930Goal 30736 · Budget 41930 | 97351324258 / 29628 | 2025-07-01 | 2025-03-01 · RJ | BRL 373,547.96 | AAI · Row 37,324 |
No subgoals match these filters.
Check recorded start authorizations
The works archive supplies 53 instrument records. It reports 51 authorizations issued and gives their issue dates. Actual starts and completion have separate records. Official works process.
53 authorization records
| Works instrument ID | Agreement and project | Authorization status | Authorization ID and issue date | Authorization archive row |
|---|---|---|---|---|
| 6359 | 877955 22765.35-30 | Issued | 56212022-06-17 | 4,191 |
| 2887 | 878366 18886.23-70 | Not issued | No recorded IDNo recorded issue date | 32,753 |
| 3777 | 878367 18887.23-26 | Not issued | No recorded IDNo recorded issue date | 32,706 |
| 7819 | 878547 51800.25-09 | Issued | 91702023-04-18 | 8,641 |
| 13568 | 879093 95664.32-80 | Issued | 126342023-10-23 | 10,674 |
| 2536 | 886237 12046.35-65 | Issued | 14342021-12-30 | 1,352 |
| 20084 | 889850 94144.32-05 | Issued | 207572025-03-17 | 17,929 |
| 9545 | 889894 11501.33-47 | Issued | 144352024-01-09 | 12,182 |
| 5863 | 891046 22766.35-97 | Issued | 54802022-06-10 | 4,050 |
| 1087 | 895978 24628.35-30 | Issued | 95792023-05-16 | 5,941 |
| 15985 | 899507 96931.25-90 | Issued | 207422025-03-17 | 17,724 |
| 12090 | 900892 20217.35-08 | Issued | 109182023-07-27 | 8,971 |
| 4154 | 904643 25151.27-90 | Issued | 43992022-05-03 | 3,135 |
| 11936 | 905339 20302.35-37 | Issued | 158062024-04-02 | 13,543 |
| 11368 | 907963 22097.31-80 | Issued | 158092024-04-02 | 13,546 |
| 15660 | 907973 38903.41-72 | Issued | 174102024-06-20 | 15,110 |
| 15079 | 917589 24678.35-57 | Issued | 161532024-04-24 | 13,886 |
| 21089 | 917591 51878.26-15 | Issued | 212602025-05-27 | 18,368 |
| 19088 | 917658 44202.35-75 | Issued | 312772026-05-26 | 26,404 |
| 15132 | 919037 36550.35-71 | Issued | 158082024-04-02 | 13,545 |
| 16729 | 919170 35404.41-10 | Issued | 239012025-09-29 | 20,772 |
| 18805 | 920442 13705.35-46 | Issued | 207882025-03-20 | 16,735 |
| 15173 | 921640 14878.52-90 | Issued | 149412024-03-08 | 12,685 |
| 19541 | 922695 134425.28-18 | Issued | 232302025-09-02 | 20,112 |
| 15587 | 923544 30372.35-78 | Issued | 156472024-03-22 | 13,389 |
| 21585 | 929373 57669.25-18 | Issued | 237962025-09-24 | 20,667 |
| 22366 | 929405 51384.29-00 | Issued | 237102025-09-19 | 20,581 |
| 22425 | 929836 15482.35-39 | Issued | 250472025-11-17 | 21,880 |
| 22065 | 934315 11541.35-75 | Issued | 251132025-11-19 | 21,936 |
| 22221 | 936178 12007.35-62 | Issued | 251172025-11-19 | 21,939 |
| 14042 | 936402 15451.25-45 | Issued | 129592023-11-09 | 10,995 |
| 22421 | 936909 19180.28-06 | Issued | 234212025-09-04 | 20,295 |
| 20624 | 944194 27574.35-00 | Issued | 209862025-04-23 | 18,101 |
| 20559 | 944198 30763.35-50 | Issued | 229082025-08-18 | 19,801 |
| 15694 | 944202 25683.25-86 | Issued | 154342024-03-14 | 13,175 |
| 18574 | 945677 29089.41-44 | Issued | 238842025-09-26 | 20,755 |
| 20567 | 946285 28643.35-10 | Issued | 209802025-04-22 | 18,095 |
| 23919 | 948419 32155.35-24 | Issued | 256762025-12-09 | 22,313 |
| 20474 | 948420 32162.35-22 | Issued | 206432025-02-26 | 17,909 |
| 20182 | 948515 33243.31-63 | Issued | 209002025-04-07 | 18,017 |
| 18654 | 951784 39241.35-93 | Issued | 188092024-08-12 | 16,865 |
| 24600 | 951855 31532.35-44 | Issued | 260702025-12-23 | 22,816 |
| 20010 | 953157 32208.42-87 | Issued | 207742025-03-19 | 16,140 |
| 20742 | 953189 31402.41-81 | Issued | 209752025-04-22 | 18,090 |
| 24842 | 953325 31534.35-57 | Issued | 260712025-12-23 | 22,817 |
| 20178 | 959442 38503.41-80 | Issued | 207412025-03-17 | 17,723 |
| 24311 | 960397 51166.33-70 | Issued | 252422025-11-25 | 22,063 |
| 22186 | 966852 42304.33-19 | Issued | 242412025-10-14 | 21,095 |
| 20929 | 968706 50388.41-40 | Issued | 378592026-11-06 | 30,774 |
| 26473 | 969926 50477.42-30 | Issued | 292852026-04-01 | 25,210 |
| 24355 | 971731 51196.31-92 | Issued | 264592026-01-08 | 22,139 |
| 23666 | 972546 51200.42-47 | Issued | 256412025-12-08 | 22,436 |
| 24258 | 973513 51879.33-03 | Issued | 257162025-12-10 | 22,499 |
No authorization records match these filters.
Coverage and evidence boundaries
The contract match requires the same proposal, a checksum-valid institutional supplier identifier, the printed contract number and the signing day. The build checks that the signature points to a single SICONV contract and a single works contract for the selected proposal. 10 CIPI-linked contracts have no exact works match in this capture.
The 58 contracts verified in the procurement payment edition have no exact works-lot match under those rules. The monitoring edition supplies separate measurement records for the proposals. Connecting an individual payment or a measurement item to one lot requires a source that carries both references.
Find procurements that link both editions. That comparison connects payments and works-lot references at procurement level.
The subgoal status column preserves the source codes AAI and ACT. Tendered amounts describe planned subgoals. Contract totals, money paid and verified delivery each have their own source records. Keep those figures separate.
Download the records and source receipts
- Full works lots edition and source receipts (JSON)
- Contract match coverage (CSV)
- Matched contract lots (CSV)
- Planned subgoals and tendered amounts (CSV)
- Recorded start authorizations (CSV)
Amounts use integer BRL cents. Row numbers count source records after the header. The JSON pins the five official archives and upstream editions. Transferegov download catalogue · Open Database License.