The Record · Brazil infrastructure 889894

Infrastructure agreement 889894

Read the Obrasgov project records and federal agreement references for ASSOCIACAO PESTALOZZI DE NITEROI.

Transferegov identifies the organization as ASSOCIACAO PESTALOZZI DE NITEROI (CNPJ 30100499000170), agreement 889894, proposal 1511560. The exact paired commitment references below connect it to Obrasgov project 11501.33-47.

Status and physical progress

Project registry status
In progress (Em execução)
Actual start date field in the registry
Unknown
Actual end date field in the registry
Unknown
Current physical report
11.61%
Physical record created
2025-06-07
Physical record updated
2026-10-21
Start and end fields in the physical report
Unknown / Unknown

The registry and the physical report record different facts. A percentage describes the published physical record. Signed acceptance, actual service delivery and changes for the people using the facility require separate evidence.

Archived physical reports

Each line below is one record in the bulk CIPI physical archive. Status codes are shown as published. Several lines can describe the same project and date.

Archive rowReport status dateStatus codePhysical progress
82622026-10-23611.61%

Works measurements

The works archive links 1 monitoring row to proposal 1511560. Each period and status comes from the measurement record. Signed site acceptance requires separate evidence.

Measurement referenceReported period StatusSource row
Monitoring contract 11102 Measurement 41479 · Report number 3 Work start in this record to Attested measurement Atestada 22619

Accumulated work-item amounts

No accumulated work-item amount is linked to this proposal in the captured archive.

Open this agreement in the works lookup.

Planned and registered locations

Same municipalities. The location comparison uses distinct IBGE municipality codes. Multiple Obrasgov records can point to the same municipality.

Transferegov work-plan goals

1 goals in the work-plan edition, including 0 without a linked municipality.

  • Niterói (IBGE 3303302)

Open the linked work-plan goals.

Obrasgov location records

Geometry recordMunicipalityIBGE codeLocation source label
1941641Niterói (RJ)3303302Par de Lat/Long

Paired budget commitments

The issuing unit and commitment number identify the same budget reference in two archives. The two amounts and dates below are each as reported by their own source. Use the issuing unit plus number to locate the original records.

Issuing unit and numberAgreement amountAgreement issue date and archive rowProject amountProject issue date and archive row
250107 / 2019NE800461 BRL 484,887.002019-12-06 · Row 283916 BRL 484,887.002019-12-06 · Row 2143
250107 / 2019NE800460 BRL 100,000.002019-12-06 · Row 283917 BRL 100,000.002019-12-06 · Row 2144

Reported contracts

The captured CIPI and SICONV archives match 1 contract record to this project and agreement. The reported global amounts are at contract scope. Payment, work-site assignment and signed acceptance each require a separate record.

Contract numberSignedReported global amountRecord coordinates
001/2023 BRL 537,784.85
2 CIPI rows and two SICONV records

Contract ID 889894 · Contract archive row 756910. Procurement ID 859525 · Procurement archive row 129900.

SICONV publication 2023-01-24. Reported contract term 2023-01-19 to 2024-03-31.

  • CIPI row 20241 · Outros · publication 2023-01-24 · portal reference 12207.
  • CIPI row 20242 · Concluído · publication 2023-01-24 · portal reference 18147.

Open this agreement in the contract lookup.

Works lots and authorizations

The works archive connects this agreement’s reported contracts to 1 lot. Find the linked lots, subgoals and start authorizations. The location records above cover the project. Assigning a lot to a site requires its own location reference.

Agreement bank orders

These bank orders belong to the agreement in the 2024–2025 Transferegov edition. They record funds made available to the agreement. Separate account and final expense records would be needed to trace purchases or money spent at this work site. Open the agreement in the bank-order lookup.

Bank-order IDReported dateAmountArchive row
3693942025-03-17BRL 80,000.07265332
3693952025-03-17BRL 387,909.93265333

Account movements

The payment archive has 3 calendar years with account movements for this agreement. Institutional invoice and receipt amounts and transfers to the agreement holder appear in separate columns. Linking a payment to this specific work site or procurement contract requires another source.

Calendar year Account movement rowsInstitutional invoice and receipt payments Transfers to agreement holderFederal bank orders in this year
2024 3 BRL 61,158.993 qualifying rows No holder-transfer rows No order rows in this edition
2025 2 BRL 82,310.022 qualifying rows No holder-transfer rows BRL 467,910.002 order rows
2026Partial year 4 BRL 252,610.184 qualifying rows No holder-transfer rows Outside the bank-order edition

Open this agreement in the account movement lookup.

Invoice items

The expense document ID links institutional payments to gross line-item amounts. The rows group documents by issue year and include the captured payments for those documents. The payments also appear in the account movement view, where they are grouped by the year the money moved.

Document issue year Documents and item rows Gross item amounts Reported payments for those documents Document comparisons
2024 3 documents3 source item rows BRL 62,420.83 BRL 61,158.99 3 payment rows · 2024 0 equal · 3 gross higher · 0 payment higher
2025 2 documents2 source item rows BRL 87,817.85 BRL 82,310.02 2 payment rows · 2025 0 equal · 2 gross higher · 0 payment higher
2026Partial year 4 documents4 source item rows BRL 270,247.81 BRL 252,610.18 4 payment rows · 2026 0 equal · 4 gross higher · 0 payment higher

Open this agreement in the invoice item lookup.

Procurement payments

The expense documents connect the captured institutional payments to 2 procurements. The captured documents yield no verified contract for those payments.

Open this agreement in the procurement payment lookup.

Find the agreement’s procurements with works-lot references.

Return to the project directory · Download the edition and source receipts.

Sources

  1. Obrasgov project record · Obrasgov.br
  2. Obrasgov registered locations · Obrasgov.br
  3. Obrasgov current physical record · Obrasgov.br
  4. Public works reporting guide · Obrasgov.br
  5. Public spending stages · Portal da Transparência
  6. siconv_empenho · Transferegov.br
  7. siconv_empenho_cipi · Transferegov.br
  8. siconv_execucao_fisica_cipi · Transferegov.br