The Record · Funding flows

Works lots and start authorizations for Brazilian civil society infrastructure

Find reported works lots, planned subgoals and authorizations linked to the original civil society infrastructure contracts.

The works archives connect 55 of the 65 CIPI-linked contracts to 57 lots in 53 agreements. A lot is a package of work under a contract. The selected lot records connect to 73 planned subgoals by instrument and lot IDs. Official works contract guide.

Find contract lots

57 lots

Lot ID and numberAgreement and projectCIPI-linked contractWorks instrument and contract IDsLot archive row
7890Lot 1 877955 22765.35-30IRMANDADE DA SANTA CASA DE MISERICORDIA DE SOROCABA 002/2022Signed 2022-03-17 6359 / 7732 15,390
3465Lot 1 878366 18886.23-70SANTA CASA DE MISERICORDIA DE SOBRAL 59326/2018Signed 2018-12-06 2887 / 22786 20,915
4523Lot 2 878367 18887.23-26SANTA CASA DE MISERICORDIA DE SOBRAL 59293/2018Signed 2018-11-14 3777 / 22990 29,155
12243Lot 1 878547 51800.25-09FUNDACAO NAPOLEAO LAUREANO 001/2022Signed 2022-01-10 7819 / 12155 23,182
16765Lot 1 879093 95664.32-80FUNDACAO HOSPITAL MATERNIDADE SAO CAMILO 001/2023Signed 2023-05-30 13568 / 16653 7,757
3043Lot 1 886237 12046.35-65FUNDACAO DOUTOR AMARAL CARVALHO 073/2021Signed 2021-10-25 2536 / 2837 11,452
24607Lot 1 889850 94144.32-05FUNDACAO HOSPITAL MATERNIDADE SAO CAMILO 138/2023Signed 2024-12-05 20084 / 24519 22,792
18254Lot 1 889894 11501.33-47ASSOCIACAO PESTALOZZI DE NITEROI 001/2023Signed 2023-01-19 9545 / 18147 10,100
7249Lot 1 891046 22766.35-97IRMANDADE DA SANTA CASA DE MISERICORDIA DE SOROCABA 002/2022Signed 2022-03-17 5863 / 7351 15,177
2111Lot 2 895978 24628.35-30INSTITUTO DAS PEQUENAS MISSIONARIAS DE MARIA IMACULADA 001/2021Signed 2021-09-27 1087 / 2131 4,133
14196Lot 1 895978 24628.35-30INSTITUTO DAS PEQUENAS MISSIONARIAS DE MARIA IMACULADA 001/2023Signed 2023-04-10 1087 / 14137 4,223
19713Lot 1 899507 96931.25-90INSTITUTO WALFREDO GUEDES PEREIRA 01/2022Signed 2023-01-24 15985 / 20282 26,124
14978Lot 1 900892 20217.35-08IRMANDADE DA SANTA CASA DE MIS DE TUPI PAULISTA 01/2023Signed 2023-02-22 12090 / 14860 4,446
6256Lot 1 904643 25151.27-90ASSOCIACAO PESTALOZZI DE MACEIO 011/2022Signed 2022-02-23 4154 / 6065 14,139
14799Lot 1 905339 20302.35-37FUNDACAO HEMOCENTRO DE RIBEIRAO PRETO 23/2023Signed 2023-03-29 11936 / 14672 19,465
14124Lot 1 907963 22097.31-80SANTA CASA DE MISERICORDIA DE SAO SEBASTIAO DO PARAISO 01/2023 - TR 907963Signed 2023-04-03 11368 / 14006 13,133
19338Lot 1 907973 38903.41-72PEQUENO COTOLENGO DO PARANA DOM ORIONE 001/2023Signed 2024-06-17 15660 / 21258 2,265
18632Lot 1 917589 24678.35-57IRMANDADE DA SANTA CASA DE MISERICORDIA DE SOROCABA 03/2023Signed 2023-11-01 15079 / 18517 5,162
25864Lot 1 917591 51878.26-15HOSPITAL INFANTIL PALMIRA SALES 001/2025/HIPSSigned 2025-04-22 21089 / 25782 14,172
34143Lot 1 917658 44202.35-75IRMANDADE DA SANTA CASA DE MISERICORDIA DE SOROCABA 02/2025Signed 2025-08-25 19088 / 34135 37,555
18702Lot 1 919037 36550.35-71SANTA CASA DE MISERICORDIA DE FARTURA 001/2023Signed 2023-12-15 15132 / 18958 18,491
28623Lot 1 919170 35404.41-10PEQUENO COTOLENGO DO PARANA DOM ORIONE 919170Signed 2025-09-16 16729 / 28478 25,785
23097Lot 1 920442 13705.35-46SANTA CASA DE MISERICORDIA DE ITUVERAVA 01/2024Signed 2024-03-20 18805 / 23081 18,409
18752Lot 1 921640 14878.52-90APAE ASSOCIACAO DE PAIS E AMIGOS DOS EXCEPCIONAIS DE ANAPOLIS 001/2023Signed 2023-12-28 15173 / 18675 16,355
23971Lot 1 922695 134425.28-18HOSPITAL SAO LUIZ GONZAGA 01/2024Signed 2025-08-26 19541 / 23907 37,498
19247Lot 1 923544 30372.35-78SANTA CASA DE POMPEIA 001/2024Signed 2024-03-11 15587 / 19274 18,284
26472Lot 1 929373 57669.25-18FUNDO MUNICIPAL DE SAUDE DE PITIMBU 004/2025Signed 2025-04-03 21585 / 26315 27,116
27396Lot 1 929405 51384.29-00ASSOCIACAO OBRAS SOCIAIS IRMA DULCE 02/2025Signed 2025-03-10 22366 / 27288 25,553
29848Lot 0 929836 15482.35-39ASSOCIACAO DE AMPARO AO EXCEPCIONAL RITINHA PRATES 001/2025Signed 2025-07-07 22425 / 29655 28,755
27037Lot 1 934315 11541.35-75IRMANDADE DA SANTA CASA DE MISERICORDIA DE SOROCABA 01/2025Signed 2025-04-04 22065 / 26902 25,221
27234Lot 1 936178 12007.35-62IRMANDADE DA SANTA CASA DE MISERICORDIA DE SOROCABA 01/2025Signed 2025-04-04 22221 / 27249 19,731
17363Lot 1 936402 15451.25-45FUNDACAO PEDRO AMERICO 119/2023Signed 2023-11-08 14042 / 17223 23,568
27457Lot 1 936909 19180.28-06HOSPITAL E MATERNIDADE SAO JOSE 027/2025Signed 2025-07-14 22421 / 27707 26,343
25256Lot 1 944194 27574.35-00SANTA CASA DE MISERICORDIA N S DAS DORES DE GAL SALGADO 002/2025Signed 2025-01-22 20624 / 25146 23,227
25184Lot 1 944198 30763.35-50IRMANDADE DA SANTA CASA DE MISERICORDIA DE SAO PAULO 1180432/2024Signed 2025-03-07 20559 / 27302 25,554
19373Lot 1 944202 25683.25-86FUNDACAO PEDRO AMERICO 01/2024Signed 2024-03-13 15694 / 19273 31,754
28599Lot 1 945677 29089.41-44PEQUENO COTOLENGO DO PARANA DOM ORIONE 004/2024Signed 2024-06-28 18574 / 28453 25,648
25194Lot 1 946285 28643.35-10IRMANDADE DA SANTA CASA DE MISERICORDIA DE PEDERNEIRAS 001/2025Signed 2025-03-05 20567 / 25165 23,548
30367Lot 1 948419 32155.35-24FUNDACAO BUTANTAN CW6708Signed 2025-10-01 23919 / 30174 27,695
25077Lot 1 948420 32162.35-22FUNDACAO BUTANTAN CW5115/2024Signed 2025-02-03 20474 / 25085 22,702
24712Lot 0 948515 33243.31-63FUNDACAO HOSPITALAR SAO VICENTE DE PAULO 112024Signed 2024-12-02 20182 / 24620 23,291
22908Lot 1 951784 39241.35-93FUNDACAO DE APOIO INST AO DESENV CIENT E TECNOLOGICO 013/2024Signed 2024-06-25 18654 / 22910 23,945
30028Lot 1 951855 31532.35-44FUNDACAO HEMOCENTRO DE RIBEIRAO PRETO 90/2025Signed 2025-09-05 24600 / 29846 29,090
27845Lot 2 953157 32208.42-87FUNDACAO UNIVERSIDADE DO OESTE DE SANTA CATARINA 178/UNOESC/2025Signed 2025-08-08 20010 / 27684 26,301
24522Lot 1 953157 32208.42-87FUNDACAO UNIVERSIDADE DO OESTE DE SANTA CATARINA 999994606/12/24/PJSigned 2024-12-20 20010 / 25327 28,574
25427Lot 2 953189 31402.41-81PEQUENO COTOLENGO DO PARANA DOM ORIONE 006/2025Signed 2025-02-18 20742 / 25303 1,959
25428Lot 1 953189 31402.41-81PEQUENO COTOLENGO DO PARANA DOM ORIONE 006/2025Signed 2025-02-18 20742 / 25303 1,960
30309Lot 2 953325 31534.35-57FUNDACAO HEMOCENTRO DE RIBEIRAO PRETO 91/2025Signed 2025-09-05 24842 / 30117 27,270
30310Lot 1 953325 31534.35-57FUNDACAO HEMOCENTRO DE RIBEIRAO PRETO 91/2025Signed 2025-09-05 24842 / 30117 27,271
24708Lot 1 959442 38503.41-80HOSPITAL DE CARIDADE SAO VICENTE DE PAULO 001/2025Signed 2025-01-08 20178 / 24615 23,239
29688Lot 1 960397 51166.33-70FUNDACAO EDUCACIONAL D ANDRE ARCOVERDE 001/2025Signed 2025-10-22 24311 / 29831 37,685
27192Lot 2 966852 42304.33-19FUNDACAO COORDENACAO DE PROJETOS,PESQUISAS E ESTUDOS TECNOLOGICOS COPPETEC 398/2025Signed 2025-07-17 22186 / 27350 26,621
40665Lot 1 968706 50388.41-40PEQUENO COTOLENGO DO PARANA DOM ORIONE 012026Signed 2026-11-06 20929 / 40517 38,021
33445Lot 2 969926 50477.42-30FUNDACAO UNIVERSIDADE DO OESTE DE SANTA CATARINA 005/2025Signed 2025-11-05 26473 / 33269 31,880
29739Lot 1 971731 51196.31-92ASS DE PAIS E AMIGOS DOS EXCEPCIONAIS DE PARA DE MINAS 001/2025Signed 2025-09-29 24355 / 29551 38,104
28936Lot 1 972546 51200.42-47SOCIEDADE LITERARIA E CARITATIVA SANTO AGOSTINHO 006/2025Signed 2025-09-03 23666 / 28788 5,724
29628Lot 2 973513 51879.33-03FUNDACAO COORDENACAO DE PROJETOS,PESQUISAS E ESTUDOS TECNOLOGICOS COPPETEC 691/2025Signed 2025-11-10 24258 / 29926 29,354

Read planned subgoals and tendered amounts

The subgoal records give planned start dates and tendered amounts in BRL. The budget reference date and locality code come from the reported budget fields. A project municipality is available on the linked project page. A lot or subgoal needs its own location record to place it at a specific work site. Official field definitions.

73 subgoals

Subgoal and budget IDsAgreement, instrument and lotPlanned startReported budget referenceTendered amountSource status and archive row
13295Goal 8621 · Budget 13295 8779556359 / 7890 2022-05-01 2020-03-01 · SP BRL 1,043,372.62 AAI · Row 11,249
6134Goal 3946 · Budget 6134 8783662887 / 3465 2021-08-01 2019-08-01 · CE BRL 231,548.09 ACT · Row 4,935
7764Goal 5105 · Budget 7764 8783673777 / 4523 2021-08-01 2019-08-01 · CE BRL 323,896.71 ACT · Row 6,338
20056Goal 13109 · Budget 20056 8785477819 / 12243 2022-05-01 2021-02-01 · PB BRL 44,095.52 AAI · Row 17,873
20057Goal 13109 · Budget 20057 8785477819 / 12243 2022-05-01 2021-02-01 · PB BRL 18,891.70 AAI · Row 17,874
20058Goal 13109 · Budget 20058 8785477819 / 12243 2022-05-01 2021-02-01 · PB BRL 19,474.49 AAI · Row 17,872
20059Goal 13109 · Budget 20059 8785477819 / 12243 2022-05-01 2021-02-01 · PB BRL 2,833.01 AAI · Row 10,212
20060Goal 13109 · Budget 20060 8785477819 / 12243 2022-05-01 2021-02-01 · PB BRL 35,540.39 AAI · Row 17,788
20061Goal 13109 · Budget 20061 8785477819 / 12243 2022-05-01 2021-02-01 · PB BRL 1,013.54 AAI · Row 18,670
20062Goal 13109 · Budget 20062 8785477819 / 12243 2022-05-01 2021-02-01 · PB BRL 7,039.66 AAI · Row 18,663
20063Goal 13109 · Budget 20063 8785477819 / 12243 2022-05-01 2021-02-01 · PB BRL 34,078.13 AAI · Row 18,669
20064Goal 13109 · Budget 20064 8785477819 / 12243 2022-05-01 2021-02-01 · PB BRL 75,351.92 AAI · Row 17,789
20065Goal 13109 · Budget 20065 8785477819 / 12243 2022-05-01 2021-02-01 · PB BRL 10,275.50 AAI · Row 17,787
20066Goal 13109 · Budget 20066 8785477819 / 12243 2022-05-01 2021-02-01 · PB BRL 71,165.58 AAI · Row 18,665
20067Goal 13109 · Budget 20067 8785477819 / 12243 2022-05-01 2021-02-01 · PB BRL 72,073.95 AAI · Row 18,668
20068Goal 13109 · Budget 20068 8785477819 / 12243 2022-05-01 2021-02-01 · PB BRL 8,885.31 AAI · Row 18,664
20069Goal 13109 · Budget 20069 8785477819 / 12243 2022-05-01 2021-02-01 · PB BRL 2,949.12 AAI · Row 17,786
20070Goal 13109 · Budget 20070 8785477819 / 12243 2022-05-01 2021-02-01 · PB BRL 14,668.61 AAI · Row 18,666
20071Goal 13109 · Budget 20071 8785477819 / 12243 2022-05-01 2021-02-01 · PB BRL 182,874.88 AAI · Row 18,662
20072Goal 13109 · Budget 20072 8785477819 / 12243 2022-05-01 2021-02-01 · PB BRL 114,996.69 AAI · Row 18,667
25742Goal 17750 · Budget 25742 87909313568 / 16765 2023-06-01 2022-03-01 · ES BRL 2,521,423.56 AAI · Row 8,295
5457Goal 3468 · Budget 5457 8862372536 / 3043 2021-12-01 2021-03-01 · SP BRL 1,999,113.63 AAI · Row 1,786
35553Goal 25694 · Budget 35553 88985020084 / 24607 2025-02-01 2021-02-01 · ES BRL 2,035,260.40 AAI · Row 32,001
27738Goal 19242 · Budget 27738 8898949545 / 18254 2022-08-01 2022-04-01 · RJ BRL 537,784.85 AAI · Row 14,389
12343Goal 7950 · Budget 12343 8910465863 / 7249 2022-05-01 2021-08-01 · SP BRL 2,470,009.55 AAI · Row 7,147
22718Goal 15143 · Budget 22718 8959781087 / 14196 2023-05-01 2020-12-01 · SP BRL 389,282.53 AAI · Row 16,596
3824Goal 2420 · Budget 3824 8959781087 / 2111 2021-11-01 2020-12-01 · SP BRL 341,200.00 AAI · Row 23,639
29665Goal 20754 · Budget 29665 89950715985 / 19713 2024-06-01 2022-08-01 · PB BRL 392,883.15 AAI · Row 25,321
23643Goal 15936 · Budget 23643 90089212090 / 14978 2023-01-01 2022-08-01 · SP BRL 539,943.47 AAI · Row 14,191
10519Goal 6900 · Budget 10519 9046434154 / 6256 2022-02-01 2021-10-01 · AL BRL 6,499,216.39 AAI · Row 9,171
23431Goal 15749 · Budget 23431 90533911936 / 14799 2023-06-01 2022-08-01 · SP BRL 505,488.69 AAI · Row 20,076
22646Goal 15072 · Budget 22646 90796311368 / 14124 2023-05-01 2022-06-01 · MG BRL 1,495,000.00 AAI · Row 17,590
29127Goal 20366 · Budget 29127 90797315660 / 19338 2023-11-01 2022-08-01 · PR BRL 337,546.51 AAI · Row 27,188
28262Goal 19629 · Budget 28262 91758915079 / 18632 2023-12-01 2023-07-01 · SP BRL 604,000.00 AAI · Row 24,211
37293Goal 26960 · Budget 37293 91759121089 / 25864 2025-05-01 2023-09-01 · PE BRL 954,616.03 AAI · Row 32,068
47731Goal 35310 · Budget 47731 91765819088 / 34143 2026-04-01 2023-07-01 · SP BRL 1,014,773.34 AAI · Row 39,836
28373Goal 19714 · Budget 28373 91903715132 / 18702 2024-01-01 2023-06-01 · SP BRL 310,559.34 AAI · Row 24,371
40677Goal 29734 · Budget 40677 91917016729 / 28623 2025-10-01 2023-05-01 · PR BRL 506,550.62 AAI · Row 35,458
33635Goal 24144 · Budget 33635 92044218805 / 23097 2024-03-01 2023-08-01 · SP BRL 362,700.40 AAI · Row 28,537
28427Goal 19761 · Budget 28427 92164015173 / 18752 2022-12-01 2022-04-01 · GO BRL 3,270,000.30 AAI · Row 24,449
34770Goal 25034 · Budget 34770 92269519541 / 23971 2024-11-01 2023-06-01 · SE BRL 1,079,500.00 AAI · Row 30,443
29022Goal 20271 · Budget 29022 92354415587 / 19247 2024-02-01 2023-08-01 · SP BRL 349,414.75 AAI · Row 23,886
37963Goal 27553 · Budget 37963 92937321585 / 26472 2025-06-01 2023-11-01 · PB BRL 401,208.88 AAI · Row 35,252
39106Goal 28474 · Budget 39106 92940522366 / 27396 2025-03-01 2024-07-01 · BA BRL 1,265,046.55 AAI · Row 34,152
42276Goal 30958 · Budget 42276 92983622425 / 29848 2025-08-01 2024-06-01 · SP BRL 2,958,680.76 AAI · Row 13,131
38652Goal 28109 · Budget 38652 93431522065 / 27037 2025-08-01 2024-06-01 · SP BRL 317,317.63 AAI · Row 33,616
38922Goal 28307 · Budget 38922 93617822221 / 27234 2025-08-01 2024-06-01 · SP BRL 1,681,580.90 AAI · Row 33,922
26540Goal 18341 · Budget 26540 93640214042 / 17363 2023-08-01 2023-05-01 · PB BRL 1,349,071.80 AAI · Row 12,294
39214Goal 28545 · Budget 39214 93690922421 / 27457 2025-04-01 2024-09-01 · SE BRL 250,294.27 AAI · Row 34,270
36474Goal 26356 · Budget 36474 94419420624 / 25256 2025-03-01 2024-05-01 · SP BRL 292,548.96 AAI · Row 31,666
36401Goal 26284 · Budget 36401 94419820559 / 25184 2025-01-01 2023-11-01 · SP BRL 285,000.21 AAI · Row 31,545
29170Goal 20401 · Budget 29170 94420215694 / 19373 2024-02-01 2023-11-01 · PB BRL 3,162,617.03 AAI · Row 23,301
40653Goal 29710 · Budget 40653 94567718574 / 28599 2024-03-01 2023-10-01 · PR BRL 500,544.56 AAI · Row 35,422
36411Goal 26294 · Budget 36411 94628520567 / 25194 2025-02-01 2024-02-01 · SP BRL 290,900.87 AAI · Row 31,555
42832Goal 31470 · Budget 42832 94841923919 / 30367 2025-10-01 2024-12-01 · SP BRL 59,478,227.53 AAI · Row 37,637
36243Goal 26170 · Budget 36243 94842020474 / 25077 2025-02-01 2024-05-01 · SP BRL 181,123,406.32 AAI · Row 31,257
35671Goal 25799 · Budget 35671 94851520182 / 24712 2025-02-01 2023-12-01 · MG BRL 963,210.04 AAI · Row 28,184
33424Goal 23960 · Budget 33424 95178418654 / 22908 2024-07-01 2023-12-01 · SP BRL 1,730,000.00 AAI · Row 28,439
42476Goal 31142 · Budget 42476 95185524600 / 30028 2025-10-01 2024-12-01 · SP BRL 331,442.69 AAI · Row 36,807
35431Goal 25596 · Budget 35431 95315720010 / 24522 2025-06-01 2024-05-01 · SC BRL 787,132.82 AAI · Row 29,170
39693Goal 25596 · Budget 39693 95315720010 / 27845 2025-08-01 2024-05-01 · SC BRL 307,904.33 AAI · Row 36,550
36677Goal 26510 · Budget 36677 95318920742 / 25427 2025-05-01 2024-10-01 · PR BRL 207,988.86 AAI · Row 31,989
36678Goal 26510 · Budget 36678 95318920742 / 25428 2025-05-01 2024-10-01 · PR BRL 135,001.24 AAI · Row 31,998
42772Goal 31413 · Budget 42772 95332524842 / 30309 2025-10-01 2024-12-01 · SP BRL 283,681.03 AAI · Row 37,615
42773Goal 31414 · Budget 42773 95332524842 / 30310 2025-10-01 2024-12-01 · SP BRL 101,778.87 AAI · Row 38,470
35667Goal 25795 · Budget 35667 95944220178 / 24708 2025-01-01 2024-10-01 · PR BRL 955,987.31 AAI · Row 27,989
42032Goal 30799 · Budget 42032 96039724311 / 29688 2025-10-01 2025-02-01 · RJ BRL 1,285,552.70 AAI · Row 35,115
38874Goal 28264 · Budget 38874 96685222186 / 27192 2025-08-01 2024-12-01 · RJ BRL 207,922.84 AAI · Row 33,890
55450Goal 41887 · Budget 55450 96870620929 / 40665 2026-11-01 2024-11-01 · PR BRL 481,626.51 AAI · Row 47,435
46806Goal 34597 · Budget 46806 96992626473 / 33445 2025-08-01 2025-04-01 · SC BRL 409,145.53 AAI · Row 30,803
42125Goal 30847 · Budget 42125 97173124355 / 29739 2025-10-01 2025-06-01 · MG BRL 1,107,348.44 AAI · Row 39,074
41084Goal 30044 · Budget 41084 97254623666 / 28936 2025-11-01 2025-04-01 · SC BRL 1,294,999.98 AAI · Row 36,094
41930Goal 30736 · Budget 41930 97351324258 / 29628 2025-07-01 2025-03-01 · RJ BRL 373,547.96 AAI · Row 37,324

Check recorded start authorizations

The works archive supplies 53 instrument records. It reports 51 authorizations issued and gives their issue dates. Actual starts and completion have separate records. Official works process.

53 authorization records

Works instrument IDAgreement and projectAuthorization statusAuthorization ID and issue dateAuthorization archive row
6359 877955 22765.35-30 Issued 56212022-06-17 4,191
2887 878366 18886.23-70 Not issued No recorded IDNo recorded issue date 32,753
3777 878367 18887.23-26 Not issued No recorded IDNo recorded issue date 32,706
7819 878547 51800.25-09 Issued 91702023-04-18 8,641
13568 879093 95664.32-80 Issued 126342023-10-23 10,674
2536 886237 12046.35-65 Issued 14342021-12-30 1,352
20084 889850 94144.32-05 Issued 207572025-03-17 17,929
9545 889894 11501.33-47 Issued 144352024-01-09 12,182
5863 891046 22766.35-97 Issued 54802022-06-10 4,050
1087 895978 24628.35-30 Issued 95792023-05-16 5,941
15985 899507 96931.25-90 Issued 207422025-03-17 17,724
12090 900892 20217.35-08 Issued 109182023-07-27 8,971
4154 904643 25151.27-90 Issued 43992022-05-03 3,135
11936 905339 20302.35-37 Issued 158062024-04-02 13,543
11368 907963 22097.31-80 Issued 158092024-04-02 13,546
15660 907973 38903.41-72 Issued 174102024-06-20 15,110
15079 917589 24678.35-57 Issued 161532024-04-24 13,886
21089 917591 51878.26-15 Issued 212602025-05-27 18,368
19088 917658 44202.35-75 Issued 312772026-05-26 26,404
15132 919037 36550.35-71 Issued 158082024-04-02 13,545
16729 919170 35404.41-10 Issued 239012025-09-29 20,772
18805 920442 13705.35-46 Issued 207882025-03-20 16,735
15173 921640 14878.52-90 Issued 149412024-03-08 12,685
19541 922695 134425.28-18 Issued 232302025-09-02 20,112
15587 923544 30372.35-78 Issued 156472024-03-22 13,389
21585 929373 57669.25-18 Issued 237962025-09-24 20,667
22366 929405 51384.29-00 Issued 237102025-09-19 20,581
22425 929836 15482.35-39 Issued 250472025-11-17 21,880
22065 934315 11541.35-75 Issued 251132025-11-19 21,936
22221 936178 12007.35-62 Issued 251172025-11-19 21,939
14042 936402 15451.25-45 Issued 129592023-11-09 10,995
22421 936909 19180.28-06 Issued 234212025-09-04 20,295
20624 944194 27574.35-00 Issued 209862025-04-23 18,101
20559 944198 30763.35-50 Issued 229082025-08-18 19,801
15694 944202 25683.25-86 Issued 154342024-03-14 13,175
18574 945677 29089.41-44 Issued 238842025-09-26 20,755
20567 946285 28643.35-10 Issued 209802025-04-22 18,095
23919 948419 32155.35-24 Issued 256762025-12-09 22,313
20474 948420 32162.35-22 Issued 206432025-02-26 17,909
20182 948515 33243.31-63 Issued 209002025-04-07 18,017
18654 951784 39241.35-93 Issued 188092024-08-12 16,865
24600 951855 31532.35-44 Issued 260702025-12-23 22,816
20010 953157 32208.42-87 Issued 207742025-03-19 16,140
20742 953189 31402.41-81 Issued 209752025-04-22 18,090
24842 953325 31534.35-57 Issued 260712025-12-23 22,817
20178 959442 38503.41-80 Issued 207412025-03-17 17,723
24311 960397 51166.33-70 Issued 252422025-11-25 22,063
22186 966852 42304.33-19 Issued 242412025-10-14 21,095
20929 968706 50388.41-40 Issued 378592026-11-06 30,774
26473 969926 50477.42-30 Issued 292852026-04-01 25,210
24355 971731 51196.31-92 Issued 264592026-01-08 22,139
23666 972546 51200.42-47 Issued 256412025-12-08 22,436
24258 973513 51879.33-03 Issued 257162025-12-10 22,499

Coverage and evidence boundaries

The contract match requires the same proposal, a checksum-valid institutional supplier identifier, the printed contract number and the signing day. The build checks that the signature points to a single SICONV contract and a single works contract for the selected proposal. 10 CIPI-linked contracts have no exact works match in this capture.

The 58 contracts verified in the procurement payment edition have no exact works-lot match under those rules. The monitoring edition supplies separate measurement records for the proposals. Connecting an individual payment or a measurement item to one lot requires a source that carries both references.

Find procurements that link both editions. That comparison connects payments and works-lot references at procurement level.

The subgoal status column preserves the source codes AAI and ACT. Tendered amounts describe planned subgoals. Contract totals, money paid and verified delivery each have their own source records. Keep those figures separate.

Download the records and source receipts

Amounts use integer BRL cents. Row numbers count source records after the header. The JSON pins the five official archives and upstream editions. Transferegov download catalogue · Open Database License.

Sources

  1. SICONV contract records · Transferegov.br
  2. Procurement records · Transferegov.br
  3. Works contracts and lots · Transferegov.br
  4. Works instruments and start authorizations · Transferegov.br
  5. Works lots and subgoals · Transferegov.br
  6. Published field definitions · Transferegov.br
  7. Works process and start authorization guidance · Transferegov.br
  8. How works contracts are recorded · Transferegov.br